Clean Out (0)
| Proposed Non-LCU Clean Out |
| Proposed LCU Clean Out |
| Proposed LCU Pressure Clean Out |
Manhole (1)
| Proposed Non-LCU Manhole |
| Proposed LCU Manhole |
Wastewater Fitting (2)
| Bend |
| Cap |
| Cross |
| Reducer |
| Tap |
| Tee |
| Transistion Coupling |
| Wye |
Sewage Meter (3)
Lift Station (4)
| Proposed Non-LCU Lift Station |
| Proposed LCU Lift Station |
| Inactive LCU Lift Station |
Grease Traps (5)
| Proposed |
Wastewater Facility (6)
| Proposed Non-LCU WWTP |
| Non-LCU WWTP |
| LCU Deep Injection Well |
| LCU WWTP |
Wastewater Valve (7)
| Proposed Non-LCU Air Release Valve |
| Proposed Non-LCU Gate Valve |
| Proposed Non-LCU Plug Valve |
| Proposed LCU Air Release Valve |
| Proposed LCU Gate Valve |
| Proposed LCU Plug Valve |
Lateral Point (8)
| Lateral Point |
Force Main (9)
| Proposed Non-LCU Force Main |
| Proposed LCU Force Main |
| <all other values> |
Gravity Main (10)
| Proposed Non-LCU Gravity Main |
| Proposed LCU Gravity Main |
Lateral (11)
| Non-LCU Sewer Lateral |
| Proposed LCU Sewer Lateral |
Wastewater Casing (12)
| Sewer Casing |
|